Can I build an ADU in the Castro/Upper Market?
It takes a building permit. In the last 3 years, 34 permits for an ADU were filed in Castro/Upper Market and 22 issued, about 44 days from filing to issue.
Counted from the City of San Francisco's permit records, as of Nov 9, 2026.
Recent permits
In the last 3 years, 34 were filed and 22 issued. Typical time from filing to issue: about 44 days.
- 359 DOUGLASS ST · Permit 202611020244
alter site- revision to bpa#202604068941.horizontal and vertical addition.rood deck,new adu,new 2 car garage.
filed · filed Nov 2, 2026 - 3650 21ST ST · Permit 202610089187
construction of a new detached, 1 story, type v-b, residential adu in rear yard.
filed · filed Oct 29, 2026 - 4300 17TH ST · Permit 202610059058
new construction of 1 detached 2-story, type v-b (adus) at western lot. each adu contains 2 beds and 1.5 baths. work includes new slab-on-grade foundations, wood-frame construction, two independent flat roof systems, exterior victorian italianate facade elements, new mechanical, electrical, plumbing
filed · filed Oct 5, 2026 - 655 NOE ST · Permit 202606304387
front building:horizontal and vertical expansion and local adu studio. new windows, doors, siding, decks at front and rear of bldg. expand garage and building below grade, new garage door and gate. interior full remodel and reconfiguration, main residence to be 4 bed, 5 baths.
filed · filed Sep 25, 2026 - 1310 CLAYTON ST · Permit 202609238536
revision to bpa# 202206216645: floor layout & window changes to (3) proposed adu's.
issued · filed Sep 23, 2026 · issued Oct 21, 2026 · 27 days - 230 CASTRO ST · Permit 202607205275
convert the rear of the (e) into state adu with new bedroom, bathroom, kitchen and study. replace 2 (e) rear windows, relocate the utility room; relocate & reuse (e) furnaces & boilers. new retainingw wall at rear.
filed · filed Sep 9, 2026 - 129 SATURN ST · Permit 202607145041
new two story adu within existing building envelope of a duplex residence
filed · filed Sep 3, 2026 - 233 DOUGLASS ST · Permit 202606223678
to create a new junior adu in the existing ground floor (using the state program).
approved · filed Aug 17, 2026 - 155 HARTFORD ST · Permit 202608116394
construction of a 1-story residential type v-b detacched adu in rear of lot.
filed · filed Aug 11, 2026 - 4345 20TH ST · Permit 202606102904
legalization udu on 1/f and addition of state adu at basement lvl. excavate (e) slab and add (n),convert into habitable space. modify front & side elevations, access stairs & add landscaping. new laundry.
filed · filed Aug 7, 2026
Other uses in Castro/Upper Market
- Can I open a café in the Castro/Upper Market?
- Can I open a restaurant in the Castro/Upper Market?
- Can I open a bar in the Castro/Upper Market?
- Can I open a retail shop in the Castro/Upper Market?
- Can I open an office in the Castro/Upper Market?
- Can I build a deck in the Castro/Upper Market?
- Can I put solar panels on my roof in the Castro/Upper Market?
- Can I put up a business sign in the Castro/Upper Market?
These counts cover the whole neighborhood. What your own project needs depends on its address and plans, so check your address before you start. City hall staff make every permit decision.