Can I open a bar in Mission Bay?

Of 5,770 parcels in Mission Bay, 0 allow a bar outright, 190 need a Planning Commission hearing, 0 do not allow it, and 5,580 have no rule loaded yet.

Counted from the City of San Francisco's zoning map, Planning Code and permit records, as of Nov 9, 2026.

Check your address

Zoning rules

  • MB-RA, 3,583 parcels: No rule loaded yet
    Planning Code § planning:902
  • UMU, 1,242 parcels: No rule loaded yet
    Planning Code § planning:843
  • MUO, 281 parcels: No rule loaded yet
    Planning Code § planning:842
  • SB-DTR, 237 parcels: No rule loaded yet
    Planning Code § planning:829
  • MUG, 190 parcels: Needs a Planning Commission hearing
    Condition: (5) P up to a total of 25,000 Gross Square Feet per lot; above 25,000 gross sq. ft. permitted only if the ratio of other permitted uses to retail is at least 3:1. CU requirements for individual uses still apply.
    Planning Code § planning:831
    Bar §§ 102, 202.2(a) C(5)
    Read the rule at the source
  • CMUO, 113 parcels: No rule loaded yet
  • PDR-1-D, 68 parcels: No rule loaded yet
    Planning Code § planning:210.3
  • MR-MU, 21 parcels: No rule loaded yet
    Planning Code § planning:249.80
  • M-2, 15 parcels: No rule loaded yet
    Planning Code § planning:210.4
  • PDR-1-G, 11 parcels: No rule loaded yet
    Planning Code § planning:210.3
  • P, 5 parcels: No rule loaded yet
    Planning Code § planning:211
  • MB-O, 4 parcels: No rule loaded yet
    Planning Code § planning:912

Recent permits

In the last 3 years, 4 were filed and 3 issued. Typical time from filing to issue: about 73 days.

  • 1 WARRIORS WY · Permit 202605191532
    add interior awning with logo signage to (e) bar @ level 200. all interior work. no work visible from exterior.
    issued · filed May 19, 2026 · issued Jul 31, 2026 · 73 days
  • 701 02ND ST · Permit 202509155305
    replace (e) counter top in (e) bar and kitchen areas. install new "eco-grip" flooring on top of (e) ceramic floor tile and install ceramic wall tile over select areas of select walls in cooking line, prep area and storage area as shown on approved drawing a1.0. replace flooring in dining room.
    complete · filed Sep 15, 2025 · issued Sep 19, 2025 · 4 days
  • 720 TERRY A FRANCOIS BL · Permit 202501168507
    space #28: new interior t.i. inclusive of partitions, ceiling, lighting, finishes, and millwork. new bar area with equipment and millwork. new bar area with equipment and storage area with 3-compartment sink for dishwashing/hot water heater. new ventilation to support kitchen storage/dish area.
    complete · filed Jan 16, 2025 · issued Apr 11, 2025 · 84 days
  • 701 03RD ST · Permit 202311160971
    revision to 202304256420: tenant improvement of a gr level bar and restaurant. revision to previous design of non structural cladding of e storefront. no mech, elec, or plumbing work.
    filed · filed Nov 16, 2023

Other uses in Mission Bay

These counts cover the whole neighborhood. Whether your own address allows the use depends on its parcel, so check your address before you sign a lease. City hall staff make every permit decision.