Can I put solar panels on my roof in Bernal Heights?
It takes a building permit. In the last 3 years, 41 permits for solar panels were filed in Bernal Heights and 33 issued, about 35 days from filing to issue.
Counted from the City of San Francisco's permit records, as of Nov 9, 2026.
Recent permits
In the last 3 years, 41 were filed and 33 issued. Typical time from filing to issue: about 35 days.
- 316 BOCANA ST · Permit S20261104784
solar permit: installing 17 solar pv modules, 410 watts per module, total no. of rating 6.97 kw. mounted: roof, ballasted: n, including 3 energy storage unit, with 5 kwh each in capacity, ess units will be closer than 3 feet | revision in the plans for already issued
filed · filed Nov 4, 2026 - 144 ELSIE ST · Permit S20261008765
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | (1) ess 13.5 kwh battery
filed · filed Oct 9, 2026 - 307 BENNINGTON ST · Permit S20260826726
solar permit: installing 8 solar pv modules, 410 watts per module, total no. of rating 3.28 kw. mounted: roof, ballasted: n | (e) 100a/100a to (n) 225a/200a
filed · filed Aug 26, 2026 - 17 30TH ST · Permit S20260720689
solar permit: installing 20 solar pv modules, 460 watts per module, total no. of rating 9.2 kw. mounted: roof, ballasted: n, including 3 energy storage unit, with 10 kwh each in capacity, ess units will be closer than 3 feet | solar roof mount 9.20kw, 20 modules. 3 iq
filed · filed Aug 19, 2026 - 561 BANKS ST · Permit S20260812712
solar permit: installing 2 solar pv modules, 440 watts per module, total no. of rating 0.88 kw. mounted: roof, ballasted: n | installation of rooftop pv expansion system. pv expansion includes: dc pv modules, dc-dc optimizers, pv racking, all necessary stanchions, cond
issued · filed Aug 13, 2026 · issued Aug 28, 2026 · 14 days - 825 MOULTRIE ST · Permit S20260721690
solar permit: installing 12 solar pv modules, 410 watts per module, total no. of rating 4.92 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | rms,12mods,exst msp100a,newsubpane
filed · filed Jul 22, 2026 - 45 COSTA ST · Permit S20260625662
solar permit: installing 17 solar pv modules, 360 watts per module, total no. of rating 6.12 kw. mounted: roof, ballasted: n | revision to issued permit e202505132408. ac disconnect relocated and moved outside the locked gate to address inspector comments. address corr
issued · filed Jun 25, 2026 · issued Aug 27, 2026 · 62 days - 316 BOCANA ST · Permit S20260513606
solar permit: installing 17 solar pv modules, 410 watts per module, total no. of rating 6.97 kw. mounted: roof, ballasted: n, including 3 energy storage unit, with 5 kwh each in capacity, ess units will not be closer than 3 feet | 6.97kw dc photovoltaic system with en
issued · filed May 14, 2026 · issued Jun 15, 2026 · 31 days - 63 AZTEC ST · Permit S20260512605
solar permit: installing 8 solar pv modules, 415 watts per module, total no. of rating 3.32 kw. mounted: roof, ballasted: n | install rooftop pv system
complete · filed May 13, 2026 · issued Jun 12, 2026 · 29 days - 4026 FOLSOM ST · Permit S20260511600
solar permit: installing 8 solar pv modules, 410 watts per module, total no. of rating 3.28 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 9.7 kwh each in capacity, ess units will not be closer than 3 feet | solar roof mount,3.28kw,8 modules,1
issued · filed May 12, 2026 · issued Jun 16, 2026 · 35 days
Other uses in Bernal Heights
- Can I open a café in Bernal Heights?
- Can I open a restaurant in Bernal Heights?
- Can I open a bar in Bernal Heights?
- Can I open a retail shop in Bernal Heights?
- Can I open an office in Bernal Heights?
- Can I build an ADU in Bernal Heights?
- Can I build a deck in Bernal Heights?
- Can I put up a business sign in Bernal Heights?
These counts cover the whole neighborhood. What your own project needs depends on its address and plans, so check your address before you start. City hall staff make every permit decision.