Can I put solar panels on my roof in Outer Mission?

It takes a building permit. In the last 3 years, 17 permits for solar panels were filed in Outer Mission and 11 issued, about 36 days from filing to issue.

Counted from the City of San Francisco's permit records, as of Nov 9, 2026.

Check your address

Recent permits

In the last 3 years, 17 were filed and 11 issued. Typical time from filing to issue: about 36 days.

  • 88 FRANCIS ST · Permit S20260928755
    solar permit: ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | revision - s20260625661 e-stop & disconnect added in front of home for the ess ac disconnect added for the existing
    issued · filed Sep 28, 2026 · issued Nov 6, 2026 · 38 days
  • 39 SANTA ROSA AV · Permit S20260806705
    solar permit: installing 12 solar pv modules, 440 watts per module, total no. of rating 5.28 kw. mounted: roof, ballasted: n | install a 5.28 kw roof-mounted photovoltaic (pv) solar system consisting of 12 seg-440-btd-bg modules with enphase iq8ac microinverters, qbase
    issued · filed Aug 10, 2026 · issued Sep 16, 2026 · 36 days
  • 1259 CAYUGA AV · Permit S20260714683
    solar permit: installing 13 solar pv modules, 435 watts per module, total no. of rating 5.655 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | pv and ess install with mpu
    filed · filed Jul 29, 2026
  • 88 FRANCIS ST · Permit S20260625661
    solar permit: ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | original permit ew202101052566 expired. powerwall was installed but no inspection was hosted. applying for a new per
    issued · filed Jun 25, 2026 · issued Aug 18, 2026 · 53 days
  • 25 ELLINGTON AV · Permit S20260625660
    solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | 13.5 kwh energy storage system
    complete · filed Jun 25, 2026 · issued Jul 13, 2026 · 17 days
  • 107 OTSEGO AV · Permit S20260622658
    solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installation of ess paired with existing pv system. energy storage system includes: (1) tesla backup switch, (1) tesl
    complete · filed Jun 24, 2026 · issued Jul 16, 2026 · 21 days
  • 249 SANTA ROSA AV · Permit S20260515613
    solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 15 kwh each in capacity, ess units will not be closer than 3 feet | install ess system only. (1) franklin apower 2 and (2) franklin agate 1.3.1., both surface mounted to interior garage
    filed · filed May 18, 2026
  • 7 BALHI CT · Permit S20260204457
    solar permit: installing 12 solar pv modules, 440 watts per module, total no. of rating 5.28 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 5 kwh each in capacity, ess units will not be closer than 3 feet | 5.28 pv + (2) 5 kwh ess
    complete · filed Feb 5, 2026 · issued Feb 23, 2026 · 17 days
  • 37 RUDDEN AV · Permit S20260121444
    solar permit: installing 8 solar pv modules, 350 watts per module, total no. of rating 2.8 kw. mounted: roof, ballasted: y | installation of a 2.8kw roof mounted solar pv system consisting of 8) sunpower spr-x21-350--blk-e-ac (350w) ac modules instring of 8 landing in
    filed · filed Jan 22, 2026
  • 155 CAPISTRANO AV · Permit S20251128364
    solar permit: installing 22 solar pv modules, 450 watts per module, total no. of rating 9.9 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 27 kwh each in capacity, ess units will be closer than 3 feet | 9.900 kw dc pv, 27.0 kwh ess,
    filed · filed Dec 1, 2025

Other uses in Outer Mission

These counts cover the whole neighborhood. What your own project needs depends on its address and plans, so check your address before you start. City hall staff make every permit decision.