Can I put solar panels on my roof in Twin Peaks?

It takes a building permit. In the last 3 years, 9 permits for solar panels were filed in Twin Peaks and 5 issued, about 33 days from filing to issue.

Counted from the City of San Francisco's permit records, as of Nov 9, 2026.

Check your address

Recent permits

In the last 3 years, 9 were filed and 5 issued. Typical time from filing to issue: about 33 days.

  • 316 DOUGLASS ST · Permit S20261006760
    solar permit: installing 14 solar pv modules, 440 watts per module, total no. of rating 6.16 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installation of pv system and ener
    filed · filed Oct 7, 2026
  • 46 SAINT GERMAIN AV · Permit S20260924749
    solar permit: installing 29 solar pv modules, 435 watts per module, total no. of rating 12.615 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | install pv and bess sy
    issued · filed Sep 24, 2026 · issued Oct 27, 2026 · 33 days
  • 249 GLENVIEW DR · Permit S20260408547
    solar permit: installing 19 solar pv modules, 450 watts per module, total no. of rating 8.55 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installation of 8.55 dc kw (19) ro
    complete · filed Apr 9, 2026 · issued May 29, 2026 · 49 days
  • 200 GRAND VIEW AV · Permit S20260218484
    solar permit: installing 59 solar pv modules, 72 watts per module, total no. of rating 4.248 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | revision to permit plan #7193 pag
    complete · filed Mar 23, 2026 · issued Jun 23, 2026 · 92 days
  • 67 CLARENDON AV · Permit S20260203455
    solar permit: installing 13 solar pv modules, 410 watts per module, total no. of rating 5.33 kw. mounted: roof, ballasted: n | remove 2 modules from the existing pv system installed and finaled under permit #e202411058011 per pg&e request. from 15 to 13 modules.
    complete · filed Mar 12, 2026 · issued Apr 2, 2026 · 20 days
  • 148 MARVIEW WY · Permit S20251126360
    solar permit: installing 20 solar pv modules, 410 watts per module, total no. of rating 8.2 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 27 vac, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | 20 roof mounted solar module
    filed · filed Dec 24, 2025
  • 30 PALO ALTO AV · Permit S20251125358
    solar permit: installing 12 solar pv modules, 545 watts per module, total no. of rating 6.54 kw. mounted: roof, ballasted: n | sfr 6.54kw pv system (12) 545w pv modules
    complete · filed Nov 25, 2025 · issued Dec 23, 2025 · 28 days
  • 163 SKYVIEW WY · Permit 202509084820
    add structure for proposed staircase @ n/w corner ans add a patio on the w side of (e)house.install(n)elect ac/heater packaged,elect waterheater & solar system.remodel(e)bath & add a 2nd bath on 1st fl.
    filed · filed Nov 4, 2025
  • 75 SKYVIEW WY · Permit S20251010176
    solar permit: installing 20 solar pv modules, 435 watts per module, total no. of rating 8.7 kw. mounted: roof, ballasted: n, including 3 energy storage unit, with 10.0 kwh each in capacity, ess units will not be closer than 3 feet | solar roof mount 8.7 kw, 20 solar p
    filed · filed Oct 14, 2025

Other uses in Twin Peaks

These counts cover the whole neighborhood. What your own project needs depends on its address and plans, so check your address before you start. City hall staff make every permit decision.