Can I build an ADU in Inner Richmond?
It takes a building permit. In the last 3 years, 21 permits for an ADU were filed in Inner Richmond and 17 issued, about 144 days from filing to issue.
Counted from the City of San Francisco's permit records, as of Nov 9, 2026.
Recent permits
In the last 3 years, 21 were filed and 17 issued. Typical time from filing to issue: about 144 days.
- 228 04TH AV · Permit 202611020248
revision to previously approved #202510298356 multi-family residential remodel and adu project. work include interior modification of kitchen & bathrooms, install of structural shear walls, seismice existing strengthening . all work performed within the existing building footprint.
filed · filed Nov 2, 2026 - 623 09TH AV · Permit 202610159484
revision to pa #202512302963 and 202311170998: add 18"x36" sh window in lightwell on ground floor adu. add (2) two openings 16"x44" (clearstory) on wall between media room and bedroom on ground floor adu
issued · filed Oct 15, 2026 · issued Oct 30, 2026 · 15 days - 330 08TH AV · Permit 202607084739
revision to adu pa# 202210194715 reconfigurating furnace location of 2nd floor adu.
issued · filed Jul 8, 2026 · issued Aug 6, 2026 · 28 days - 166 10TH AV · Permit 202510308593
convert 450 sq ft of garage space into 1 bedroom adu. voluntary structural seismic stengthening retrofit. nfpa 133r fire sprinkler system to be submitted on separate permit.
filed · filed Mar 31, 2026 - 537 10TH AV · Permit 202506239197
convert existing detached garage to adu at rear.
filed · filed Mar 31, 2026 - 137 A 12TH AV · Permit 202602025049
revision to pa # 202211166648: state program adu, remove sprinklers & reverse occupancy per memorandum dated 11.06.2023. adu sprinkler removal & occupancy change reversal.
issued · filed Mar 13, 2026 · issued Aug 5, 2026 · 144 days - 161 A 09TH AV · Permit 202602025044
add 2 adus @ unoccupied 1st flr storage & garage area under local planning code section 207.1 includes voluntary seismic upgrade. (e) garge door removed. renovation of the 2 (e) units @ 2nd & 3rd floors. renovation of the kitchen & addition of 1 (n)bedrm. & bath rm @ each unit.
filed · filed Feb 19, 2026 - 230 04TH AV · Permit 202510298356
legalization of illegal unit as approved under #2017-011948prj, remodel of kitchen and bathroom at new adu, unit 3-2/f. replace wood stairs at rear of building. upgrade electrical panel for adu to 100amp panel. install new street tree in sidewalk. state adu program.
issued · filed Feb 11, 2026 · issued Oct 30, 2026 · 260 days - 623 09TH AV · Permit 202512302963
revision to pa #202311170998: revise a door opening location in the adu with minor structural revisions, window material to vinyl and landscaping in the rear yard. all other scopes to remain unchanged.
issued · filed Dec 30, 2025 · issued Oct 15, 2026 · 288 days - 550 A 03RD AV · Permit 202506279665
new adu on 1/f: new living/dining room, kitchen, berdoom, bathroom & 2 closets.
issued · filed Oct 27, 2025 · issued Oct 2, 2026 · 339 days
Other uses in Inner Richmond
- Can I open a café in Inner Richmond?
- Can I open a restaurant in Inner Richmond?
- Can I open a bar in Inner Richmond?
- Can I open a retail shop in Inner Richmond?
- Can I open an office in Inner Richmond?
- Can I build a deck in Inner Richmond?
- Can I put solar panels on my roof in Inner Richmond?
- Can I put up a business sign in Inner Richmond?
These counts cover the whole neighborhood. What your own project needs depends on its address and plans, so check your address before you start. City hall staff make every permit decision.