Can I build an ADU in Presidio Heights?
It takes a building permit. In the last 3 years, 10 permits for an ADU were filed in Presidio Heights and 5 issued, about 130 days from filing to issue.
Counted from the City of San Francisco's permit records, as of Nov 9, 2026.
Recent permits
In the last 3 years, 10 were filed and 5 issued. Typical time from filing to issue: about 130 days.
- 156 PALM AV · Permit 202606253950
rear structure: convert (e) legal non-confirming garage structural to adu via state adu program per planning code section 207.2.
filed · filed Sep 18, 2026 - 91 A PALM AV · Permit 202606223669
remodel (e) 719 sf ground floor into attached 719 sf 1 bedroom adu in (e) tenancy in common duplex.
issued · filed Jul 27, 2026 · issued Sep 23, 2026 · 57 days - 2880 BUSH ST · Permit 202509246038
legalize existing rear yard rental cottage to adu per ord# 43-14.
filed · filed Jun 16, 2026 - 2929 PINE ST · Permit 202512222373
non structural -interior remodel to create an accessory dwelling unit converted from existing single family dwelling and associate plumbing and electrical works in a space were an unauthorized dwelling unit was found to be have previously existed.
approved · filed May 15, 2026 - 643 SPRUCE ST · Permit 202507231421
legalize an existing adu under state program. building will upgrade existing bedroom windows to comply with code required emergency exiting to rear yard. an upgrade to existing separation wall from garage to code compliant fire rated 1-hr protection.
issued · filed Apr 24, 2026 · issued Sep 1, 2026 · 130 days - 3255 PACIFIC AV · Permit 202512161925
full-gut interior remodel-(n)roof finish, updated facades, rear adu (state program), & basement expansion. proposed revision to north and first 23' - 0" of west facade to be submitted under spearate permit. renovation of rear courtyard & associated landscaping. (e) shed demo under separate permit.
approved · filed Apr 8, 2026 - 750 PRESIDIO AV · Permit 202507291815
per california government code 65852.2, turn part of garage and storage area into 3 new adus, new laundry room, reduced storage area w/ new toilet room.
issued · filed Sep 5, 2025 · issued Mar 11, 2026 · 186 days - 2828 GEARY BL · Permit 202505136393
convert (e) laundry room into a new adu.
filed · filed Aug 11, 2025 - 3621 CLAY ST · Permit 202403016894
revision to 202211287187 to correct foundation for adu located at rear of property. changes at facade, roof and ceiling framing, footing detail. no work in public right of way,no mep, or fixture count changechanges @ facade roof framing/ceiling framing , footing detail
reinstated · filed Mar 1, 2024 · issued Mar 1, 2024 · 0 days - 2 B LUPINE AV · Permit 202402206131
develope (e) utility basement of the (e) single family dwelling into an attached adu per state program:install (n) kitchen with a living,dining,kitchen,room.install (n) bedroom with full bath.install detached pre-fab 4'6" x 5' x 6'ht utility shed at (e) exterior concrete patio.
complete · filed Feb 20, 2024 · issued Sep 9, 2024 · 201 days
Other uses in Presidio Heights
- Can I open a café in Presidio Heights?
- Can I open a restaurant in Presidio Heights?
- Can I open a bar in Presidio Heights?
- Can I open a retail shop in Presidio Heights?
- Can I open an office in Presidio Heights?
- Can I build a deck in Presidio Heights?
- Can I put solar panels on my roof in Presidio Heights?
- Can I put up a business sign in Presidio Heights?
These counts cover the whole neighborhood. What your own project needs depends on its address and plans, so check your address before you start. City hall staff make every permit decision.