Can I open a bar in Presidio Heights?

Of 2,940 parcels in Presidio Heights, 157 allow a bar outright, 167 need a Planning Commission hearing, 0 do not allow it, and 2,616 have no rule loaded yet.

Counted from the City of San Francisco's zoning map, Planning Code and permit records, as of Nov 9, 2026.

Check your address

Zoning rules

  • RH-1, 793 parcels: No rule loaded yet
    Planning Code § planning:209.1
  • RH-2, 683 parcels: No rule loaded yet
    Planning Code § planning:209.1
  • RH-3, 314 parcels: No rule loaded yet
    Planning Code § planning:209.1
  • RM-1, 308 parcels: No rule loaded yet
    Planning Code § planning:209.2
  • RTO-C, 248 parcels: No rule loaded yet
  • NCD-SACRAMENTO, 167 parcels: Needs a Planning Commission hearing
    Condition: Controls by story: 1st C; 2nd NP; 3rd+ NP.
    Planning Code § planning:724
    Bar §§ 102, 202.2(a) C NP NP
    Read the rule at the source
  • RH-1(D), 160 parcels: No rule loaded yet
    Planning Code § planning:209.1
  • RM-2, 100 parcels: No rule loaded yet
    Planning Code § planning:209.2
  • NC-S, 77 parcels: Permitted
    Condition: Controls by story: 1st P(1); 2nd P(1); 3rd+ NP. (1) LAKESHORE PLAZA SPECIAL USE DISTRICT Boundaries: Applicable only for the Lakeshore Plaza NC-S District as mapped on Sectional Map SU13 and HT13. Controls: Special controls on various features and uses, and residential standards per Section 780.1, and special Height controls per Section 253.3.
    Planning Code § planning:713
    Bar §§ 102, 202.2(a) P(1) P(1) NP
    Read the rule at the source
  • NCD-GEARY BOULEVARD, 58 parcels: Permitted
    Condition: Controls by story: 1st P; 2nd P; 3rd+ NP.
    Planning Code § planning:739
    Bar §§ 102, 202.2(a) P P NP
    Read the rule at the source
  • NC-2, 13 parcels: Permitted
    Condition: Controls by story: 1st P(9); 2nd NP; 3rd+ NP. (9) C in the area comprising all of that portion of the City and County commencing at the point of the intersection of the shoreline of the Pacific Ocean and a straight-line extension of Lincoln Way, and proceeding easterly along Lincoln Way to 17th Avenue, and proceeding southerly along 17th Avenue to Judah Street, and proceeding westerly along Judah Street to 19th Avenue, and proceeding southerly along 19th Avenue to Sloat Boulevard, and proceeding westerly along Sloat Boulevard, and following a straight-line extension of Sloat Boulevard to the shoreline of the Pacific Ocean and proceeding northerly along said line to the point of commencement.
    Planning Code § planning:711
    Bar §§ 102, 202.2(a) P(9) NP NP
    Read the rule at the source
  • NC-3, 9 parcels: Permitted
    Condition: Controls by story: 1st P(3); 2nd P(3); 3rd+ NP. (3) THIRD STREET SPECIAL USE DISTRICT Boundaries: Applicable only to the portion of the Third Street SUD as shown on Sectional Map 10 SU zoned NC-3. Controls: Off-sale retail liquor sales are NP; drive-up facilities for Restaurants and Limited-Restaurants are C.
    Planning Code § planning:712
    Bar §§ 102, 202.2(a) P(3) P(3) NP
    Read the rule at the source
  • P, 9 parcels: No rule loaded yet
    Planning Code § planning:211
  • C-2, 1 parcel: No rule loaded yet
    Planning Code § planning:210.1

Recent permits

In the last 3 years, 2 were filed and 2 issued. Typical time from filing to issue: about 30 days.

  • 3240 GEARY BL · Permit 202606153244
    change of use from bar/b to retail sales/m. (e) bar previously removed to be legalize. comply with complaint 202656636
    reinstated · filed Jun 15, 2026 · issued Jun 26, 2026 · 11 days
  • 1319 LYON ST · Permit 202408128439
    kitchen and bath remodel on upper level. create master bedroom with bathroom for upper level. create new bar at lower level. new electrical wiring for entire house. new plumbing for new master bath and laundry room.
    complete · filed Aug 12, 2024 · issued Sep 30, 2024 · 49 days

Other uses in Presidio Heights

These counts cover the whole neighborhood. Whether your own address allows the use depends on its parcel, so check your address before you sign a lease. City hall staff make every permit decision.