Can I open a bar in Financial District/South Beach?
Of 12,470 parcels in Financial District/South Beach, 0 allow a bar outright, 123 need a Planning Commission hearing, 0 do not allow it, and 12,347 have no rule loaded yet.
Counted from the City of San Francisco's zoning map, Planning Code and permit records, as of Nov 9, 2026.
Zoning rules
- RH DTR, 2,586 parcels: No rule loaded yet
Planning Code § planning:827 - C-3-O(SD), 2,323 parcels: No rule loaded yet
Planning Code § planning:210.2 - SB-DTR, 2,218 parcels: No rule loaded yet
Planning Code § planning:829 - RC-4, 1,687 parcels: No rule loaded yet
Planning Code § planning:209.3 - C-3-O, 714 parcels: No rule loaded yet
Planning Code § planning:210.2 - TB DTR, 695 parcels: No rule loaded yet
Planning Code § planning:828 - C-3-R, 622 parcels: No rule loaded yet
Planning Code § planning:210.2 - CMUO, 443 parcels: No rule loaded yet
- C-2, 434 parcels: No rule loaded yet
Planning Code § planning:210.1 - MUO, 373 parcels: No rule loaded yet
Planning Code § planning:842 - C-3-S, 143 parcels: No rule loaded yet
Planning Code § planning:210.2 - SPD, 72 parcels: Needs a Planning Commission hearing
Condition: (5) Up to a total of 5,000 sq. ft. per lot; NP above.
Planning Code § planning:837Bar §§ 102, 202.2(a) C(5)
Read the rule at the source - P, 56 parcels: No rule loaded yet
Planning Code § planning:211 - CCB, 51 parcels: Needs a Planning Commission hearing
Condition: Controls by story: 1st C; 2nd C; 3rd+ C.
Planning Code § planning:810Bar § 102 C C C
Read the rule at the source - M-1, 17 parcels: No rule loaded yet
Planning Code § planning:210.4 - C-3-G, 16 parcels: No rule loaded yet
Planning Code § planning:210.2 - MUR, 8 parcels: No rule loaded yet
Planning Code § planning:842 - M-2, 6 parcels: No rule loaded yet
Planning Code § planning:210.4 - RM-4, 6 parcels: No rule loaded yet
Planning Code § planning:209.2
Recent permits
In the last 3 years, 15 were filed and 13 issued. Typical time from filing to issue: about 29 days.
- 1 FRONT ST · Permit 202605282039
interior renovation at 2nd floor, (n) bar, (n) gym and (n) coworking office, (n) ceiling, lighting, millwork and finishes. (n) connecting stair from 1/f to 2/f.
filed · filed Sep 14, 2026 - 101 NEW MONTGOMERY ST · Permit 202606163286
interior tenant improvement for converstion of e coffee shop to a cocktail lounge w limited food preparation. scope includes interior demo, construction of bar and service area, new bathrooms, new finishes, millwork, lighting. electrical, plumbing. no changes to building envelope.
issued · filed Jun 16, 2026 · issued Aug 20, 2026 · 64 days - 50 HAWTHORNE ST · Permit 202604270180
3rd floor interior tenant improvement to include new barista bar serving coffee, tea and grab & go prepackaged food. new back of house catering area.
complete · filed Apr 27, 2026 · issued May 27, 2026 · 29 days - 181 FREMONT ST · Permit 202602065479
remove (e) bar, island and shelves at living room. add recessed lights throughtout unit. san and refinish hardwood floors-paint throughout.
complete · filed Feb 6, 2026 · issued Feb 6, 2026 · 0 days - 555 MARKET ST · Permit 202512121719
1/fl- (n) amenity bar/restaurant space, basketball court, lounge area, includes (n) conference rooms, countertop bar and island, seating, restrooms, finishes, and lighting throughout. 2/fl (n) lighting, ceilings, and finishes throughout. (n) pickleball court, fitness area, fitness, classroom, new
issued · filed Dec 12, 2025 · issued Feb 25, 2026 · 74 days - 399 FREMONT ST · Permit 202507211259
remove existing barbecues and sink. demolish existing barbeques, counter and sinks. re-build new proposed barbeque counter, maintaining existing power, gas,and connections. install new barbeques (2 total) install new sinks (2 total). deferred mep). no plumbing fixures.
complete · filed Jul 21, 2025 · issued Jul 22, 2025 · 0 days - 350 MISSION ST · Permit 202506309783
2/f - ti (e)restaurant & bar located. add accessory use for 2(n) golf simulators with metal trellis; modification & removal of (e) wood trellis; existing building is fully sprinkler. fire sprinklers for (n) golf simulators under separate application. no change of existing mechanical
complete · filed Jun 30, 2025 · issued Sep 9, 2025 · 71 days - 488 FOLSOM ST · Permit 202504184713
unit #4401: interior remodel new dropped ceiling in living/dining, new recessed lighting, new linear slot diffusers, new blind doors and new barn door. existing sprinklers to be lowered to meet code and by certified contractor
complete · filed Apr 18, 2025 · issued Apr 18, 2025 · 0 days - 201 PINE ST · Permit 202503192526
installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new retaurant. (wayfare tavern)
complete · filed Mar 19, 2025 · issued Mar 26, 2025 · 7 days - 201 PINE ST · Permit 202503192527
installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new retaurant. " wayfare tavern" sign wraps around battery & pine st corner
complete · filed Mar 19, 2025 · issued Mar 26, 2025 · 7 days
Other uses in Financial District/South Beach
- Can I open a café in Financial District/South Beach?
- Can I open a restaurant in Financial District/South Beach?
- Can I open a retail shop in Financial District/South Beach?
- Can I open an office in Financial District/South Beach?
- Can I build an ADU in Financial District/South Beach?
- Can I build a deck in Financial District/South Beach?
- Can I put solar panels on my roof in Financial District/South Beach?
- Can I put up a business sign in Financial District/South Beach?
These counts cover the whole neighborhood. Whether your own address allows the use depends on its parcel, so check your address before you sign a lease. City hall staff make every permit decision.