Can I open an office in Financial District/South Beach?
Of 12,470 parcels in Financial District/South Beach, 0 allow a general office outright, 0 need a Planning Commission hearing, 0 do not allow it, and 12,470 have no rule loaded yet.
Counted from the City of San Francisco's zoning map, Planning Code and permit records, as of Nov 9, 2026.
Zoning rules
- RH DTR, 2,586 parcels: No rule loaded yet
Planning Code § planning:827 - C-3-O(SD), 2,323 parcels: No rule loaded yet
Planning Code § planning:210.2 - SB-DTR, 2,218 parcels: No rule loaded yet
Planning Code § planning:829 - RC-4, 1,687 parcels: No rule loaded yet
Planning Code § planning:209.3 - C-3-O, 714 parcels: No rule loaded yet
Planning Code § planning:210.2 - TB DTR, 695 parcels: No rule loaded yet
Planning Code § planning:828 - C-3-R, 622 parcels: No rule loaded yet
Planning Code § planning:210.2 - CMUO, 443 parcels: No rule loaded yet
- C-2, 434 parcels: No rule loaded yet
Planning Code § planning:210.1 - MUO, 373 parcels: No rule loaded yet
Planning Code § planning:842 - C-3-S, 143 parcels: No rule loaded yet
Planning Code § planning:210.2 - SPD, 72 parcels: No rule loaded yet
Planning Code § planning:814 - P, 56 parcels: No rule loaded yet
Planning Code § planning:211 - CCB, 51 parcels: No rule loaded yet
Planning Code § planning:810 - M-1, 17 parcels: No rule loaded yet
Planning Code § planning:210.4 - C-3-G, 16 parcels: No rule loaded yet
Planning Code § planning:210.2 - MUR, 8 parcels: No rule loaded yet
Planning Code § planning:842 - M-2, 6 parcels: No rule loaded yet
Planning Code § planning:210.4 - RM-4, 6 parcels: No rule loaded yet
Planning Code § planning:209.2
Recent permits
In the last 3 years, 266 were filed and 251 issued. Typical time from filing to issue: about 13 days.
- 44 MONTGOMERY ST · Permit 202611060445
ste 1305 pa 202605010461 deferred electrical permit office tenant remodel. new 1" for 1" replacement lighting fixtures & associated circuiting/controls
issued · filed Nov 6, 2026 · issued Nov 6, 2026 · 0 days - 235 MONTGOMERY ST · Permit 202611020234
24th fl - interior ti of existing vacant office space. new partitions, finishes and lighting. mep, fire life and sprinkler under separate permit
issued · filed Nov 2, 2026 · issued Nov 4, 2026 · 2 days - 345 SPEAR ST · Permit 202610290119
1/f lobby ti: construction of non-load bearing partitions. modifications to (e) ceiling grid and tile. new office doors, frames, millwork and new finishes.
filed · filed Oct 29, 2026 - 415 KEARNY ST · Permit 202610279978
construction of interior office space including new partitions, millwork, dodors, frames sidelights, lighting and ceiling tiles.
filed · filed Oct 27, 2026 - 1 CALIFORNIA ST · Permit 202610269885
interior tenant improvement to renovate level 31 for office use. the project comprises an open office layout with several private offices, a pantry, small meeting rooms, and a large conference room. architectural,mep and structural modifications include new lighting fixtures, revised power outlets
issued · filed Oct 26, 2026 · issued Nov 4, 2026 · 9 days - 1 SANSOME ST · Permit 202610229764
23/f: ti including office layout,restrooms and break room, structural strengthening at assembly areas. mep included
filed · filed Oct 22, 2026 - 1 SANSOME ST · Permit 202610229763
21/f: ti including office layout,restrooms and break room, structural strengthening at assembly areas. mep included
filed · filed Oct 22, 2026 - 345 SPEAR ST · Permit 202610219700
1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg
filed · filed Oct 21, 2026 - 1 CALIFORNIA ST · Permit 202610209654
16/f: relocate existing demising wall between 2 office suites, scope includes demo and construction of non structural partitions, ceilings, glazing, doors, millwork, finish and restroom upgrade.
issued · filed Oct 20, 2026 · issued Oct 29, 2026 · 9 days - 50 CALIFORNIA ST · Permit 202609178254
existing interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroom.
issued · filed Sep 17, 2026 · issued Sep 24, 2026 · 7 days
Other uses in Financial District/South Beach
- Can I open a café in Financial District/South Beach?
- Can I open a restaurant in Financial District/South Beach?
- Can I open a bar in Financial District/South Beach?
- Can I open a retail shop in Financial District/South Beach?
- Can I build an ADU in Financial District/South Beach?
- Can I build a deck in Financial District/South Beach?
- Can I put solar panels on my roof in Financial District/South Beach?
- Can I put up a business sign in Financial District/South Beach?
These counts cover the whole neighborhood. Whether your own address allows the use depends on its parcel, so check your address before you sign a lease. City hall staff make every permit decision.