Can I open a café in South of Market?
Of 7,992 parcels in South of Market, 478 allow a limited restaurant outright, 0 need a Planning Commission hearing, 0 do not allow it, and 7,514 have no rule loaded yet.
Counted from the City of San Francisco's zoning map, Planning Code and permit records, as of Nov 9, 2026.
Zoning rules
- MUR, 2,030 parcels: No rule loaded yet
Planning Code § planning:841 - C-3-G, 1,348 parcels: No rule loaded yet
Planning Code § planning:210.2 - CMUO, 1,314 parcels: No rule loaded yet
- RED, 674 parcels: No rule loaded yet
Planning Code § planning:813 - RED-MX, 558 parcels: No rule loaded yet
Planning Code § planning:847 - WMUG, 436 parcels: No rule loaded yet
Planning Code § planning:844 - SALI, 383 parcels: No rule loaded yet
Planning Code § planning:846 - MUG, 342 parcels: No rule loaded yet
Planning Code § planning:840 - RCD, 210 parcels: Permitted
Condition: Controls by story: 1st P(5); 2nd P; 3rd+ NP. (5) P up to 10,000 gross square feet per lot; NP above.
Planning Code § planning:758Restaurant, Limited §§ 102, 202.2(a) P(5) P NP
Read the rule at the source - NCT-FOLSOM, 188 parcels: Permitted
Condition: Controls by story: 1st P(6); 2nd P; 3rd+ NP. (6) NP above 10,000 Gross Square Feet per Lot.
Planning Code § planning:757Restaurant, Limited §§ 102, 202.2(a) P(6) P NP
Read the rule at the source - C-3-S, 135 parcels: No rule loaded yet
Planning Code § planning:210.2 - UMU, 88 parcels: No rule loaded yet
Planning Code § planning:843 - NCT-SOMA, 80 parcels: Permitted
Condition: Controls by story: 1st P; 2nd NP; 3rd+ NP.
Planning Code § planning:753Restaurant, Limited §§ 102, 202.2(a) P NP NP
Read the rule at the source - P, 46 parcels: No rule loaded yet
Planning Code § planning:211 - WMUO, 45 parcels: No rule loaded yet
Planning Code § planning:845 - C-3-R, 43 parcels: No rule loaded yet
Planning Code § planning:210.2 - MUO, 39 parcels: No rule loaded yet
Planning Code § planning:842 - PDR-1-G, 27 parcels: No rule loaded yet
Planning Code § planning:210.3 - RC-4, 6 parcels: No rule loaded yet
Planning Code § planning:209.3
Recent permits
In the last 3 years, 24 were filed and 19 issued. Typical time from filing to issue: about 51 days.
- 1114 BRYANT ST · Permit 202609148084
add in new walk-in cooler at (e) restaurant space. new hand sink in storage room.
issued · filed Sep 14, 2026 · issued Sep 29, 2026 · 14 days - 564 04TH ST · Permit 202608106307
commerical restaurant: remove and replace type ducting, exhaust fan, and access doors due to fire damage on roof. same airflow. edge distance per cbc 1015.6. terminate per cmc 510.9. slope, construction, & cleanouts per cmc chpt 5 part ii.
complete · filed Aug 10, 2026 · issued Aug 13, 2026 · 2 days - 555 BRYANT ST · Permit 202607285660
suite 100: tenant improvement, coffee shop, in existing warm shell space on gr fl with e accessible entrance from sidewalk and 2 e accessible restrooms. change of use from m to b occupancy. new fully accessible service support and customer areas. no exterior work.
issued · filed Jul 28, 2026 · issued Sep 23, 2026 · 57 days - 1220 HOWARD ST · Permit 202606163324
pge meter relocation for future cafe space. build mechanical room to house new meters and distribution panels.
filed · filed Jun 16, 2026 - 560 NATOMA ST · Permit 202605040608
first floor: replace drywall on walls and ceiling. replace utility sink. second floor: replace drywall on ceilings and walls. replace bathroom sink and relocate toilet. replace coffee sink in kitchen. install 3 space heaters. no structural work
issued · filed May 4, 2026 · issued May 4, 2026 · 0 days - 229 09TH ST · Permit 202604169547
new kitchen for bakery and coffee shop, new equipment, finishes and fixtures, no structural, no exterior work. revision to 202507110609
complete · filed Apr 16, 2026 · issued May 15, 2026 · 29 days - 1160 HOWARD ST · Permit 202604089119
1/fl-commercial ti to include (n) bakery sales counter/coffee bar (relocate existing) remodel seating area. (n) electrical and plumbing work via separate permit. no exterior work.
complete · filed Apr 8, 2026 · issued May 22, 2026 · 43 days - 655 04TH ST · Permit 202512222432
painted sign: coffee waffle
filed · filed Dec 22, 2025 - 120 04TH ST · Permit 202511250468
interior tenant improvement for a nw cafe in space previosly occupied by starbucks. work includes nw non-structural partitions, finishes, fixtures, kitchen equipment, service counter, accessibility upgrades & modifications to architectural louver locations. hvac to remain. no change to primary use.
issued · filed Nov 25, 2025 · issued Jan 23, 2026 · 58 days - 1385 HARRISON ST · Permit 202511079180
existing 1 story warehouse - empty grow facility to be converted to a small coffee roasting, retail sales & cafe with a new 2nd floor. fully sprinklered building
issued · filed Nov 7, 2025 · issued Dec 19, 2025 · 42 days
Other uses in South of Market
- Can I open a restaurant in South of Market?
- Can I open a bar in South of Market?
- Can I open a retail shop in South of Market?
- Can I open an office in South of Market?
- Can I build an ADU in South of Market?
- Can I build a deck in South of Market?
- Can I put solar panels on my roof in South of Market?
- Can I put up a business sign in South of Market?
These counts cover the whole neighborhood. Whether your own address allows the use depends on its parcel, so check your address before you sign a lease. City hall staff make every permit decision.