Can I put solar panels on my roof in South of Market?

It takes a building permit. In the last 3 years, 7 permits for solar panels were filed in South of Market and 7 issued, about 14 days from filing to issue.

Counted from the City of San Francisco's permit records, as of Nov 9, 2026.

Check your address

Recent permits

In the last 3 years, 7 were filed and 7 issued. Typical time from filing to issue: about 14 days.

  • 1256 HOWARD ST · Permit 202607064565
    revision to bpa: 202502100001 - for correction of title 24 to eliminate solar requirements.
    issued · filed Jul 6, 2026 · issued Jul 7, 2026 · 1 days
  • 955 NATOMA ST · Permit S20260130453
    solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | (1) tesla powerwall 3 [1707000-xx-y] (13.5 kw) (1) tesla backup switch [1624171-xx-y]
    issued · filed Feb 2, 2026 · issued Feb 23, 2026 · 20 days
  • 44 SHERIDAN ST · Permit 202512091351
    ref s20251119348- elevated aluminuim support for solar
    complete · filed Dec 9, 2025 · issued Jan 7, 2026 · 29 days
  • 44 SHERIDAN ST · Permit S20251119348
    solar permit: installing 36 solar pv modules, 435 watts per module, total no. of rating 15.66 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | flat rooftop pv on elev
    complete · filed Nov 20, 2025 · issued Jan 21, 2026 · 62 days
  • 44 SHERIDAN ST · Permit 202510308515
    demo existing roofing & sheeting. replace new 2x8 joists & sister to existing. new mounting brackets for solar array
    complete · filed Oct 30, 2025 · issued Nov 13, 2025 · 14 days
  • 395 06TH ST · Permit 202507019927
    administrative application for deferred submittal pv solar for main building permits 201712146448-s7 and 201912129351-s7 to include "395 06th st." new address is still the same block/lot: 3753/148.
    complete · filed Jul 1, 2025 · issued Jul 1, 2025 · 0 days
  • 333 07TH ST · Permit 202412035986
    reroofing. cool roof required: minimum 75 solar reflectance index or sr 0.63 and te 0.75.
    complete · filed Dec 3, 2024 · issued Dec 3, 2024 · 0 days

Other uses in South of Market

These counts cover the whole neighborhood. What your own project needs depends on its address and plans, so check your address before you start. City hall staff make every permit decision.