Can I open an office in West of Twin Peaks?

Of 13,784 parcels in West of Twin Peaks, 0 allow a general office outright, 0 need a Planning Commission hearing, 0 do not allow it, and 13,784 have no rule loaded yet.

Counted from the City of San Francisco's zoning map, Planning Code and permit records, as of Nov 9, 2026.

Check your address

Zoning rules

  • RH-1(D), 7,248 parcels: No rule loaded yet
    Planning Code § planning:209.1
  • RH-1, 4,711 parcels: No rule loaded yet
    Planning Code § planning:209.1
  • RTO-C, 700 parcels: No rule loaded yet
  • RH-2, 314 parcels: No rule loaded yet
    Planning Code § planning:209.1
  • NCT-OCEAN, 190 parcels: No rule loaded yet
    Planning Code § planning:755
  • NC-1, 150 parcels: No rule loaded yet
    Planning Code § planning:710
  • NCD-INNER TARAVAL STREET, 126 parcels: No rule loaded yet
    Planning Code § planning:745
  • RM-1, 115 parcels: No rule loaded yet
    Planning Code § planning:209.2
  • NCD-WEST PORTAL, 90 parcels: No rule loaded yet
    Planning Code § planning:729
  • P, 66 parcels: No rule loaded yet
    Planning Code § planning:211
  • NCT-GLEN PARK, 29 parcels: No rule loaded yet
    Planning Code § planning:756
  • NCD-LAKESIDE VILLAGE, 23 parcels: No rule loaded yet
    Planning Code § planning:727
  • BR-MU, 19 parcels: No rule loaded yet
    Planning Code § planning:263.35
  • NC-2, 3 parcels: No rule loaded yet
    Planning Code § planning:711

Recent permits

In the last 3 years, 6 were filed and 6 issued. Typical time from filing to issue: about 19 days.

  • 45 FOREST SIDE AV · Permit 202605121087
    1/f: convert partial (e) family room to new bedroom #2. remodel (e) bath #2. add new walk-in closet. convert partial (e) garage to new study room, new bath #3 and new powder room. relocate (e) stairs from 1/f to 2/f. 2/f: convert (e) bedroom #2 to new office room. add new radiant floor heating.
    issued · filed May 12, 2026 · issued May 15, 2026 · 3 days
  • 2435 OCEAN AV · Permit 202510076895
    new exterior ada ramp, new ada restroom, new breakroom, new layout configuration at existing office space. mep defer.
    issued · filed Oct 7, 2025 · issued Oct 23, 2025 · 15 days
  • 167 CRESTA VISTA DR · Permit 202507291882
    conversion of (e) laundry into 1/2 bath. partial conversion of (e) living room into office. replace (1) (e) picture window with an operable window. add (1) (n) window in office space.
    complete · filed Jul 29, 2025 · issued Aug 22, 2025 · 23 days
  • 380 WEST PORTAL AV · Permit 202409170940
    new accessible bathroom to be located within (e) office space. no vertical or horizontal addition. no structural work. no change of use. mep under separate permit
    complete · filed Sep 17, 2024 · issued Feb 25, 2025 · 161 days
  • 20 SAN PABLO AV · Permit 202405172388
    proposed conversion of crawl space to accomdate (2) bedrooms, new offices (2) new bathrooms, all work to be performed within the (e) boundary of the building
    complete · filed Jul 17, 2024 · issued Jan 21, 2025 · 187 days
  • 98 SANTA RITA AV · Permit 202312082179
    lower level: convert 885 sf of storage to living space. install a new powder room and replace (e) bath. new media room. new office. main level: remove wall between kitchen and dining room. convert bedroom to nook. new slidng door in livng to backyard. upper level: reconfigure bathroom and closet for
    complete · filed Dec 8, 2023 · issued Dec 11, 2023 · 3 days

Other uses in West of Twin Peaks

These counts cover the whole neighborhood. Whether your own address allows the use depends on its parcel, so check your address before you sign a lease. City hall staff make every permit decision.