Can I put solar panels on my roof in West of Twin Peaks?
It takes a building permit. In the last 3 years, 75 permits for solar panels were filed in West of Twin Peaks and 53 issued, about 40 days from filing to issue.
Counted from the City of San Francisco's permit records, as of Nov 9, 2026.
Recent permits
In the last 3 years, 75 were filed and 53 issued. Typical time from filing to issue: about 40 days.
- 577 ULLOA ST · Permit S20261012766
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | (1) ess 13.5 kwh battery
filed · filed Oct 13, 2026 - 111 EDGEHILL WY · Permit S20261002759
solar permit: installing 29 solar pv modules, 440 watts per module, total rating 11.88 kw; roof mounted; including 2 energy storage unit, with 10 kwh each in capacity, ess units will be closer than 3 feet | installation of ess paired with pv system.
filed · filed Oct 5, 2026 - 467 URBANO DR · Permit S20260826724
solar permit: installing 11 solar pv modules, 410 watts per module, total no. of rating 4.51 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 5 kwh each in capacity, ess units will not be closer than 3 feet | (e) 125a/100a to (n) 225a
filed · filed Aug 26, 2026 - 130 CIRCULAR AV · Permit S20260824721
solar permit: installing 9 solar pv modules, 420 watts per module, total no. of rating 3.78 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | 3.78kw pv array ( 9 pan
issued · filed Aug 24, 2026 · issued Sep 14, 2026 · 21 days - 175 MADRONE AV · Permit S20260811708
solar permit: installing 9 solar pv modules, 410 watts per module, total no. of rating 3.69 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 5 kwh each in capacity, ess units will not be closer than 3 feet | residential roof mount pv
withdrawn · filed Aug 13, 2026 - 667 HEARST AV · Permit S20260812713
solar permit: installing 12 solar pv modules, 435 watts per module, total no. of rating 5.22 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | installing a 5.22 kw photovoltaic syst
filed · filed Aug 13, 2026 - 82 EASTWOOD DR · Permit S20260812711
solar permit: installing 8 solar pv modules, 410 watts per module, total no. of rating 3.28 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 5 kwh each in capacity, ess units will not be closer than 3 feet | residential roof mount pv system w/ess
issued · filed Aug 13, 2026 · issued Sep 29, 2026 · 47 days - 160 UPLAND DR · Permit S20260727695
solar permit: installing 20 solar pv modules, 440 watts per module, total no. of rating 8.8 kw. mounted: roof, ballasted: n, including 3 energy storage unit, of 240 vac, with 9.02 kwh each in capacity, ess units will be closer than 3 feet | installation of the followi
issued · filed Jul 28, 2026 · issued Oct 13, 2026 · 76 days - 260 VALDEZ AV · Permit S20260715684
solar permit: installing 19 solar pv modules, 460 watts per module, total no. of rating 8.74 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 10 kwh each in capacity, ess units will not be closer than 3 feet | (removing existing pv sy
filed · filed Jul 15, 2026 - 209 KENSINGTON WY · Permit S20260706672
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | install new franklin energy storage system on exterior
issued · filed Jul 7, 2026 · issued Sep 17, 2026 · 72 days
Other uses in West of Twin Peaks
- Can I open a café in West of Twin Peaks?
- Can I open a restaurant in West of Twin Peaks?
- Can I open a bar in West of Twin Peaks?
- Can I open a retail shop in West of Twin Peaks?
- Can I open an office in West of Twin Peaks?
- Can I build an ADU in West of Twin Peaks?
- Can I build a deck in West of Twin Peaks?
- Can I put up a business sign in West of Twin Peaks?
These counts cover the whole neighborhood. What your own project needs depends on its address and plans, so check your address before you start. City hall staff make every permit decision.