Can I build an ADU in North Beach?
It takes a building permit. In the last 3 years, 17 permits for an ADU were filed in North Beach and 11 issued, about 32 days from filing to issue.
Counted from the City of San Francisco's permit records, as of Nov 9, 2026.
Recent permits
In the last 3 years, 17 were filed and 11 issued. Typical time from filing to issue: about 32 days.
- 114 JASPER PL · Permit 202608076277
new adu on 1/f including kitchen, 1 media room, sleeping area, & 1 3-fixture bathroom.
filed · filed Sep 29, 2026 - 500 BEACH ST · Permit 202609288722
interior demolition and consturction ofn non structural elements including but not necessarily limted to interior partitions, door, finishes,ceilings, lighting, mech, electrical outlets switches. new multi stall and gnr rr5 pot and ramp and stair under prev appvd 202607024493 mep deferred
filed · filed Sep 28, 2026 - 1723 STOCKTON ST · Permit 202606012219
convert 1/f storage into adu per state adu program, planning code section 207.2.
filed · filed Jul 20, 2026 - 433 LOMBARD ST · Permit 202502059722
legalization of unauthorized unit (unit 8- 433a lombard) as state adu. referance work proposed under seperate permit, which is to legalize unit 7 under the legalization program.
filed · filed Nov 5, 2025 - 572 CHESTNUT ST · Permit 202507100522
install (2) new adu at groudn flr; reconfigure front stair; minor street encroachment under separate permit; modification to (e) guardrail at front stair; new sidewalk landscaping permit under separate permit; install new sprinklers through ground floor-nfpa 13r per fs-05-under separate permit.
approved · filed Sep 30, 2025 - 42 JASPER PL · Permit 202508213650
installation of 13d fire protection system and a talco home hydraqnt to ensure the 13 d system works. specific adu #202001141806. underground under separate permit.
issued · filed Aug 21, 2025 · issued Sep 29, 2025 · 38 days - 71 WATER ST · Permit 202508082635
as builts for pa # 2021-0126-3375. new adu need to add three low frequency sounders. ref pa #2018-0110-8309 (new adu) # 2021-0621-2852 (asb-1)
complete · filed Aug 8, 2025 · issued Aug 18, 2025 · 10 days - 71 WATER ST · Permit 202508042234
per pa# 202012030215. construction & completion of sprinkler system. adu on ground fl sprinkler system. ref to adu pa# 201801108309
complete · filed Aug 4, 2025 · issued Aug 4, 2025 · 0 days - 642 LOMBARD ST · Permit 202507221317
rear bldg: add 2 adu, local adu program per planning code section 207.1 exterior work includes new egress stair and landing at center of lot and replacement of front gate. response to complaint 202422936 and 201902761.
issued · filed Jul 30, 2025 · issued Dec 31, 2025 · 154 days - 444 UNION ST · Permit 202506188980
install fire sprinkler for adu only new 2" fire underground ref pa # 2022-0411-1924
complete · filed Jun 18, 2025 · issued Jun 20, 2025 · 2 days
Other uses in North Beach
- Can I open a café in North Beach?
- Can I open a restaurant in North Beach?
- Can I open a bar in North Beach?
- Can I open a retail shop in North Beach?
- Can I open an office in North Beach?
- Can I build a deck in North Beach?
- Can I put solar panels on my roof in North Beach?
- Can I put up a business sign in North Beach?
These counts cover the whole neighborhood. What your own project needs depends on its address and plans, so check your address before you start. City hall staff make every permit decision.