Can I open a restaurant in North Beach?

Of 2,773 parcels in North Beach, 0 allow a restaurant outright, 513 need a Planning Commission hearing, 0 do not allow it, and 2,260 have no rule loaded yet.

Counted from the City of San Francisco's zoning map, Planning Code and permit records, as of Nov 9, 2026.

Check your address

Zoning rules

  • RH-3, 952 parcels: No rule loaded yet
    Planning Code § planning:209.1
  • C-2, 555 parcels: No rule loaded yet
    Planning Code § planning:210.1
  • NCD-NORTH BEACH, 513 parcels: Needs a Planning Commission hearing
    Condition: Controls by story: 1st C(5); 2nd NP; 3rd+ NP. (5) Restaurants and Bars may be permitted as a Conditional Use on the First Story through the procedures set forth in Section 303 only if the Zoning Administrator first determines that the proposed new Restaurant or Bar would occupy a space that is currently or was last legally occupied by one of the uses described below; provided that its last use has not been discontinued or abandoned pursuant to Sections 186.1(d) or 178(d) of this Code and that the proposed new use will not enlarge the space; and provided further that no Conditional Use shall be required if the use remains the same as the prior authorized use, with no enlargement or intensification of use: (A) A Bar may occupy a space that is currently or last legally occupied by a Bar; (B) A Restaurant may occupy a space that is currently or was last legally occupied by a Limited Restaurant, Restaurant or Bar; (C) Except as provided herein, no other use shall be allowed to convert to a Restaurant or Bar.
    Planning Code § planning:722
    Restaurant §§ 102, 202.2(a) C(5) NP NP
    Read the rule at the source
  • RM-2, 343 parcels: No rule loaded yet
    Planning Code § planning:209.2
  • RM-1, 246 parcels: No rule loaded yet
    Planning Code § planning:209.2
  • RM-3, 65 parcels: No rule loaded yet
    Planning Code § planning:209.2
  • NCD-BROADWAY, 62 parcels: No rule loaded yet
    Planning Code § planning:714
  • P, 26 parcels: No rule loaded yet
    Planning Code § planning:211
  • M-1, 8 parcels: No rule loaded yet
    Planning Code § planning:210.4
  • RTO-C, 3 parcels: No rule loaded yet

Recent permits

In the last 3 years, 15 were filed and 14 issued. Typical time from filing to issue: about 30 days.

  • 373 BROADWAY · Permit 202607074604
    interior t.i. for (e) restaurant space. remove interior partition new reception counter, countertop seating, accessible restroom, kitchen equipment at cookline only. no mech scope of work. plumbing and electrical and hood/duct fire suppression system are deferred submittals by contractor.
    issued · filed Jul 7, 2026 · issued Jul 16, 2026 · 9 days
  • 2699 TAYLOR ST · Permit 202605121131
    t.i. 1) remodel existing restaurant at ground floor including install new kitchen hood system. 2) add new kitchen.
    issued · filed May 12, 2026 · issued Jun 10, 2026 · 28 days
  • 2237 MASON ST · Permit 202601224287
    upgrade fas in hotel portion of building to comply w/ 2022 code. restaurant space will be upgraded as part of future work.
    filed · filed Jan 22, 2026
  • 1040 COLUMBUS AV · Permit 202512232570
    repair water damages for interior walls in a vacant restaurant
    issued · filed Dec 23, 2025 · issued Dec 23, 2025 · 0 days
  • 1318 GRANT AV · Permit 202512040923
    renovation of e bar into new restaurant. project includes new plumbing and equipment. no structural work or electrical work.
    complete · filed Dec 4, 2025 · issued Mar 4, 2026 · 90 days
  • 478 GREEN ST · Permit 202507030102
    g//f restaurant -patching a bathroom wall 10"x 10". replacing 2 light fixtures above the sink and replacing 2 faucets. (like for like restroom only)
    issued · filed Jul 3, 2025 · issued Jul 3, 2025 · 0 days
  • 498 BEACH ST · Permit 202502271194
    tenant improvement of a 5,102sf food truck renovation, full restaurant use located at northeast corner of jones & beach in fisherman's wharf. project will provide 5 food truck stalls with designated entry points for each truck.
    issued · filed Jun 3, 2025 · issued May 20, 2026 · 350 days
  • 552 GREEN ST · Permit 202505136331
    legalize business signs (sotto mare restaurant) through amnesty program.
    complete · filed May 13, 2025 · issued Aug 8, 2025 · 87 days
  • 211 JEFFERSON ST · Permit 202412176961
    change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvements
    complete · filed May 12, 2025 · issued Nov 7, 2025 · 179 days
  • 333 JEFFERSON ST · Permit 202504174605
    t.i. of existing restaurant suites to build out single restaurant suite for taco bell cantina.
    complete · filed Apr 17, 2025 · issued Aug 4, 2025 · 109 days

Other uses in North Beach

These counts cover the whole neighborhood. Whether your own address allows the use depends on its parcel, so check your address before you sign a lease. City hall staff make every permit decision.