Can I open a bar in North Beach?

Of 2,773 parcels in North Beach, 0 allow a bar outright, 575 need a Planning Commission hearing, 0 do not allow it, and 2,198 have no rule loaded yet.

Counted from the City of San Francisco's zoning map, Planning Code and permit records, as of Nov 9, 2026.

Check your address

Zoning rules

  • RH-3, 952 parcels: No rule loaded yet
    Planning Code § planning:209.1
  • C-2, 555 parcels: No rule loaded yet
    Planning Code § planning:210.1
  • NCD-NORTH BEACH, 513 parcels: Needs a Planning Commission hearing
    Condition: Controls by story: 1st C(5); 2nd NP; 3rd+ NP. (5) Restaurants and Bars may be permitted as a Conditional Use on the First Story through the procedures set forth in Section 303 only if the Zoning Administrator first determines that the proposed new Restaurant or Bar would occupy a space that is currently or was last legally occupied by one of the uses described below; provided that its last use has not been discontinued or abandoned pursuant to Sections 186.1(d) or 178(d) of this Code and that the proposed new use will not enlarge the space; and provided further that no Conditional Use shall be required if the use remains the same as the prior authorized use, with no enlargement or intensification of use: (A) A Bar may occupy a space that is currently or last legally occupied by a Bar; (B) A Restaurant may occupy a space that is currently or was last legally occupied by a Limited Restaurant, Restaurant or Bar; (C) Except as provided herein, no other use shall be allowed to convert to a Restaurant or Bar.
    Planning Code § planning:722
    Bar §§ 102, 202.2(a) C(5) NP NP
    Read the rule at the source
  • RM-2, 343 parcels: No rule loaded yet
    Planning Code § planning:209.2
  • RM-1, 246 parcels: No rule loaded yet
    Planning Code § planning:209.2
  • RM-3, 65 parcels: No rule loaded yet
    Planning Code § planning:209.2
  • NCD-BROADWAY, 62 parcels: Needs a Planning Commission hearing
    Condition: Controls by story: 1st C; 2nd C; 3rd+ NP.
    Planning Code § planning:714
    Bar § 102 C C NP
    Read the rule at the source
  • P, 26 parcels: No rule loaded yet
    Planning Code § planning:211
  • M-1, 8 parcels: No rule loaded yet
    Planning Code § planning:210.4
  • RTO-C, 3 parcels: No rule loaded yet

Recent permits

In the last 3 years, 5 were filed and 5 issued. Typical time from filing to issue: about 25 days.

  • 38 VARENNES ST · Permit 202601143873
    install butlers pantry/wetbar in e living room. add coat closet to living room. no structural walls partitions. new barsink tied to e small bath group. new light.
    issued · filed Jan 14, 2026 · issued Sep 17, 2026 · 245 days
  • 1600 STOCKTON ST · Permit 202507241485
    recover/replace (3) fabric on existing awnings with handpainted lettering "acquolina - pizza - cafe. wine bar" to match existing. [fabric only]
    complete · filed Jul 24, 2025 · issued Jul 24, 2025 · 0 days
  • 165 JEFFERSON ST · Permit 202503202691
    demolish e kitchen restrooms and bar counter and front wall. new wall and ada resroom. rollup door. change of use from existing bar use to general retail.
    complete · filed Mar 20, 2025 · issued Apr 15, 2025 · 25 days
  • 270 COLUMBUS AV · Permit 202410112820
    remodel existing bar area at 1st floor and lower level; conversion of prep kitchen to warewashing area.
    complete · filed Oct 11, 2024 · issued Oct 21, 2024 · 10 days
  • 1371 GRANT AV · Permit 202311130670
    renovation of (e) bar with new bar, accessible entry, accessible bathroom, new stairs, new partitions, new lighting and electrical, new equipment.
    complete · filed Nov 13, 2023 · issued Dec 8, 2023 · 25 days

Other uses in North Beach

These counts cover the whole neighborhood. Whether your own address allows the use depends on its parcel, so check your address before you sign a lease. City hall staff make every permit decision.